Recycled Water Line Project
Market: Water
Owner: Los Angeles World Airports (LAWA)
Delivery method: Bid-Build
Project Details: Installation of traffic control, steel plating and construction fencing. Demolition of existing pavement, curb & gutter and sidewalk pavement. Clearing and grubbing. Earthwork including excavation of pipe trench and vault trench and installation of temporary shoring system. Installation of 12” PVC recycled water pipeline, utility vault and associated Infrastructures. Backfill and construction of new AC and PCC pavement. Construction of concrete curb and gutter. Construction of sidewalk. Installation of pavement marking and signage.
Scope of work:
• Project quality management
• Develop and implement the Quality Control Plan
• Punchlist, asbuilt and closeout
• Structural Observations